How to organise groundworks

Darren Livesey asks:

I have a simple question, I think?

At the groundworks stage of a build, how do people decide where everything is going? I have an overall plot drawing to scale, which was needed for outline planning permission. Is it now up to me to tell the groundworker where to lay the services, drains etc and can he simply just work from my instructions and the overall plot drawing?

What will he need for the foundations - does this come in the form of a building regs drawing? It is all very confusing and seems rather daunting. We also need a pumping station installing as the house is lower than the private foulwater sewer. Who designs this? Can I just tell the groundworker to put it "there" for instance? I think I am getting confused with what the architect requires for submitting to building control and what the groundworker "works" off.


Housebuilder's Bible author Mark Brinkley reckons:

A few brave souls decide to build off planning permission drawings, but it's really not to be recommended, esp. if you have never done it before. It would be a bit like setting out to drive from Aberystwyth to Hunstanton with nothing but postcard of Hunstanton pier to guide you. You need a map.

The groundworker will do what you tell him to: he may get it right, he may not. If it's wrong, it will be up to you, not him, to rectify it. What you need is a load more drawings and a few specifications. Normally these form part of a building regs application. In the vernacular of the building trade, "the job needs to be specked up." First the house needs to be detailed so you at least know the dimensions and locations of the walls, and you need to decide which ones will be load bearing. Someone, usually the architect, has to do this work: it's absolutely standard practice. Only then can you proceed to a foundation/floor design, also usually carried out as part of the specking up. The drains and services should also be detailed
with reference to the house layout (where are the bathrooms?) and the site levels. You may find that the drainage suppliers will do this work for you for free, if you supply them with levels and a detailed floor plan.

Then you proceed to the setting out stage where you, in effect, transfer the details from the drawings onto the ground. Then when the groundworker comes to do his stuff, it's all a bit like painting by numbers. He has not so much a map as a paper trail guiding him where to go. It's also much faster, and much less prone to error. Believe me, when the excavators start moving earth around, you really don't want to be guessing where the wall should be or where the pumping station should be going.

• We also need a pumping station installing as the
• house is lower than the private foulwater sewer. Who designs this -
• can I just tell the groundworker to put it "there" for instance?

The position of the pumping station will be partly governed by building regs - Part H covers this in England & Wales - and partly by common sense. There will be a minimum distance you will have to place it from the house (I seem to remember it's 4.5 m min): after that it's up to you and your designer/groundworker. The building inspector will advise.

Don't rush. Remember that every hour spent in preparation saves at least three spent snagging at completion.

If you can only see this single article on screen please click on the 'Housebuilder's Update' heading (screen top left) to view the rest of this month's items and have access to our archives.

8 Comments:

Anonymous Margaux said...

Thank you for the tips! We are about to renovate our Manila real estate. Hopefully, these tips will be implemented by our home builders.

10:31 am  
Anonymous Jane said...

Ditto. Our home builders could use some of these tips in constructing our house. Thanks.

9:47 am  
Blogger Erica White said...

I think home building should not be rushed. Even if the workers are paid by the hour, the quality of the house should always be the priority.

Long Island mortgage rates

4:14 am  
Anonymous park avenue condos said...

I'll be sure to keep this in mind organizing is really important especially if your just planning your house.

5:21 am  
Blogger Anne said...

When it comes to constructing huge establishments and complex architectures, concrete mixers and concrete pump are important to ensure proper pouring of concrete materials.

3:55 am  
Blogger Zheng junxai5 said...

zhengjx20160803
toms outlet
replica watches
adidas nmd
michael kors outlet
michael kors handbags
louis vuitton purses
oakley sunglasses wholesale
michael kors outlet
true religion jeans
ralph lauren polo
toms wedges
kobe shoes 11
michael kors outlet
michael kors purses
jordan retro 4
louis vuitton bags
michael kors outlet
jordan shoes
burberry handbags
michael kors outlet online
michael kors outlet online
coach outlet store online
ray ban sunglasses
michael kors outlet
adidas outlet store
louis vuitton handbags
adidas factory outlet
christian louboutin outlet
kate spade handbags
kobe shoes
michael kors outlet clearance
retro jordans 13
polo ralph lauren
gucci handbags
jordan retro 11
adidas uk
adidas superstar
coach factory outlet
adidas stan smith
ray ban sonnenbrille

2:21 am  
Blogger John said...

louboutin outlet
cheap jordan shoes
coach outlet online
cheap nike shoes
mlb jerseys
cheap ugg sale
fitflops sale clearance
jordans
ugg boots
michael kors outlet clearance
2017223yuanyuan

2:10 am  
Blogger dong dong23 said...

adidas originals
cheap jordan shoes
oakley sunglasses
salvatore ferragamo
uggs outlet
nike air max
michael kors outlet 70% off
hermes birkin bag
polo ralph lauren uk
canada goose sale
201711.4wengdongdong

10:44 am  

Post a Comment

<< Home